Long title
A Bill to make provision to require factors other than cost to be considered for schemes for the transmission of high voltage electricity where infrastructure would impact on the visual and other amenity of a landscape; to provide that in certain cases such infrastructure be installed by visually unobtrusive works; to require that public consultation be undertaken and inform the selection of the method and technology for the transmission infrastructures used; and for connected purposes
Sponsor
Bill passage
Key